SUBHASH KUMARversusSTATE OF BIHAR AND ORS.
- Citation
- 1991 INSC 3
- Decided
- 9 January 1991
- Disposal
- Dismissed
- Bench
- K N SINGH
Holding
A petition under Article 32 for environmental protection must be filed by a person genuinely interested in public welfare; if driven by personal grievance, it is an abuse of process and must be dismissed.
Summary
Subhash Kumar filed a writ petition under Article 32 of the Constitution, claiming that West Bokaro Collieries and Tata Iron & Steel Co. were polluting the Bokaro river by discharging slurry from their washeries, thereby violating the right to life under Article 21. He also alleged that the State of Bihar and its Pollution Control Board had failed to act and sought directions to stop the discharge and an interim order allowing him to collect the slurry. The respondents contended that they had obtained permission under Sections 25 and 26 of the Water (Prevention and Control of Pollution) Act, 1974, had constructed settling tanks, and that no effluent was being released into the river. The Court examined whether the petition was a genuine public‑interest litigation or an abuse of process driven by the petitioner's personal commercial interest in the slurry. Finding that the petitioner had been purchasing the slurry for his own business, that the allegations of pollution were unsupported, and that the Pollution Board had taken effective steps, the Court held the petition was filed in personal interest and could not be entertained under Article 32. Consequently, the petition was dismissed with costs awarded to the respondents.
Issues considered
- Whether a writ petition under Article 32 alleging environmental pollution can be entertained as public interest litigation when the petitioner has a personal commercial interest.
- Whether the petitioner has locus standi to invoke Article 32 for the prevention of water pollution.
- Whether the allegations of pollution, without material evidence, are sufficient to justify directions under the Water (Prevention and Control of Pollution) Act, 1974.
- Whether such a petition constitutes an abuse of the Court's process.
Legislation cited
- Constitution of Indias. Article 21, s. Article 32
- Water (Prevention and Control of Pollution) Act, 1974s. 17, s. 24, s. 25, s. 26
Subjects
Judgment
SUBHASH KUMAR
A
v.
STATE OF BIHAR AND ORS.
JANUARY 9, 1991
[K.N. SINGH AND N.D. OJHA, JJ.] B
Water (Prevention and Control of Pollution) Act, 1974: Sections
17, 24, 25 and 26.
Constitution of India, 1950: Article 21-Right to live includes
right to enjoyment of pollution free water and air-A citizen has a right C
to invoke Article 32 for removing pollution.
Article 32-Writ petition in public interest-Allegation that West
Bokaro Collieries and Tata Iron and Steel Company are polluting the
river Bokaro by discharging slurry from their washeries into the river-
No material to substantiate the allegations-Held petition is not in D
public interest but for personal interest.
Public Interest Litigation-Should be ·resorted to by a person
genuinely interested in the protection of society-Personal interest can-
not be enforced in the garb of public interest litigation-Entertainment of
petitions satisfying personal grudge is abuse of process of the Court- E
Duty of the court is to discourage such petitions.
The petitioner filed a writ petition in this court by way of public
interest litigation alleging that the respondents, West Bokaro Collieries
and Tata Iron and Steel Company (TISCO) were polluting the river
Bokaro by discharging surplus waste in the form of sludge/slurry as F
effluent from their washeries into the river making the river water unfit
for drinking and irrigation purposes thereby causing risk to the health
of the people; the State of Bihar and the State Pollution Control Board
have failed to take appropriate steps for prevention of the pollution and
instead the State of Bihar has granted leases on payment of royalty to
various persons for collection . of slurry. Accordingly the petitioner G
prayed for directions to the respondents to take immediate steps pro-
hibiting the pollution of the river and to take legal action against TISCO
under the Water (Prevention and Control of Pollution) Act, 1974. The
petitioner also claimed interim relief from this Court that he should be
permitted to collect sludge/slurry flowing out of washeries of the
respondents. H
5
6 SUPREME COURT REPORTS [1991] 1 S.C.R.
The respondents contested the petition denying the petitioner's
A allegations. Bihar State Pollution Board asserted that directions have ,..\..__
been issued to the Bokaro Collieries to take effective steps for improving
the quality of the emuent going into the river Bokaro and that the
TISCO Company has been granted permission to discharge their
effluents from their outlets in accordance with sections 25 and 26 of the
B 1974 Act. On behalf of TISCO and the Bokaro Collieries it was con-
tended that all effective steps have been taken to prevent the pollution
and they have complied with the instructions of the State Pollution
~
Board.
-( '
By an order dated 13.12.1990, this Court dismissed the writ peti-
c tion'with costs. ,.,..'
I
Giving reasons for dismissal of the petition, this Court,
HELD: 1. Article 32 is designed for the enforcement of Fonda-
T
mental Rights of a citizen by the Apex Court. It provides for an extra-
D ordinary remedy to safeguard the fundamental rights of a citizen.
Right to life is a fundamental right under Article 21 of the Constitution
and it includes the right of enjoyment of pollution free water and air for
full enjoyment of life. If anything endangers or impairs that quality of
life in derogation of laws, a citizen bas right to have recourse to Article
32 of the Constitution for removing the pollution of water or air which /
E may be detrimental to the quality of life. A petition under Article 32 for
the prevention of pollution is maintainable at the instance of affected
persons or even by a group of social workers or journalists. But
recourse to proceeding under Article 32 of the Constitution should be
taken by a person genuinely interested in the protection of society on
..
behalf of the community. Public interest litigation cannot be invoked by
F a person or body of persons to satisfy his or its personal grudge and ~
enmity. If such petitions under Article 32 are entertained it would -1
amount to abuse of process of the Court, preventing speedy remedy to
other genuine petitioners from this Court. Personal interest cannot be
enforced through the process of this Court under Article 32 of the
Constitution in the garb of a public interest litigation. Pllblic -interest
G litigation contemplates legal proceeding for vindication or enforcement
of fundamental rights of a group of persons or community which are not
able to enforce their fundamental rights on account of their incapacity,
poverty or ignorance of law. A person invoking the jurisdiction of this
' --,.--- .
Court under Article 32 must approach this Court for the vindication of
the fundamental rights of affected persons and not for the purpose of
H vindication of his personal grudge or enmity.
-- -
It is duty of this Court to
"
\
SUBHASH v. STATE OF BIHAR 7
discourage such petitions and to ensure that the course of justice is not
A
,.,..i, obstructed or polluted by unscrupulous litigants by invoking the extra-
ordinary jurisdiction of this Court for personal matters under the garb
of the public interest litigation. [13C-H; 14A]
Bandhua Mukti Morcha v. Union of India, [1984] 2 SCR 67;
Sachindanand Pandey v. State of West Bengal, [1987] 2 SCC 295; B
Ramsharan Autyanuprasi & Anr. v. Union of India & Ors., [1989]
...._I Suppl. 1 SCC 251; Chetriya Pardushan Mukti Sangharsh Sa.miti v. State
of U. P. & Ors., [1990] 4 SCC 449, referred to.
r 2. The present petition is not filed in public "interest inste~d the
.... petition has been made by the petitioner in his own interest. lnfact there
is intrinsic evidence in the petition itself that the primary purpose of c
filing this petition is not to serve any public interest instead it is in
self-interest. The petitioner has been purchasing slurry from the
/
respondents for the last several years. With the passage of time he
T wanted more and more slurry but the Company refused to accept his
request. He removed the Company's slurry in an unauthorised manner D
for which criminal cases are pending against him and his brother. Since
the respondent company refused to sell additional slurry he entertained
a grudge against the company and in order to feed fat his personal
grudge he resorted to several proceedings against the company includ-
~ ing the present one. The prayer for the interim relief made by the
petitioner i.e. permittjng him to arrest/collect sludge/slurry flowing out E
of the washeries of the respondents with a direction to the State
of Bihar, its officers and other ·authorities for not preventing him
..
~ from collecting the sludge jslurry and transporting the same also collect-
ing the sludge /Slurry and transporting the saine clearly indicates that
he is interested in collecting the slurry and transporting the same for the
~ purposes of his business. Therefore, there is no good reason to accept F
the petitioner's allegation that the water of the river Bokaro is being
J polluted by the discharge of sludge or slurry into it from the washeries
of the respondent-company. On the other hand it is evident from
records that the State Pollution Contro! Board has taken effective steps
to check the pollution. [14B; 12F-G]
/ G
Kundori Labou_rs Cooperative Society Ltd. & etc. etc. v. State of
~----< Bihar & Ors., AIR 1986.·Patna 242; Bharat Coki":_g Coal Ltd. v. Sta~e_of
Bihar & Ors., f1990]} SCR 744 = Juclgrnents Today,_ Vol. 3, _1990 SC_C
533, referred to.
ORIGINAL JURISDICTION: Writ Petiti<;>n (C) No. 381 of H
1988.
8 SUPREME COURT REPORTS [1991] 1 s.c.R.
(Under Article 32 of the Constitution of India).
A
S.K. Sinha for the Petitioner.
D. Goburdhan, Ms. A. Subhashini, K.K. Lahiri, Ms. Lira
Goswami and D .N. Misra for the Respondents.
B
The Judgment of the Court was delivered by
SINGH, J. We heard the arguments in detail on 13.12.1990 and
dismissed the petition with costs amounting to Rs.5,000 with the direc-
tion that the reasons shall be delivered later on. We are, accordingly,
delivering our reasons.
c
This petition is under Article 32 of the Constitution by Subhash
. \Kumar for the issue of a writ or direction directing the director of
Collieries, West Bokaro Collieries at Ghatotand, District Hazaribagh r
\ in the State of Bihar and the Tata from & Steel Co. Ltd. to stop
D ·forthwith discharge of slurry/sludge from its washeries at Ghatotand in
the District of Hazaribagh into Bokaro river. This petition is by way of
public interest litigation for preventing the pollution of the Bokaro
river water from the sludge/slurry discharged from the washeries of the
Tata Iron & Steel Co. Ltd. The petitioner has alleged that the Parlia-
ment has enacted the Water (Prevention and Control of Pollution)
E Act, 1974 (hereinafter referred to as 'the Act') providing for the pre-
vention and control of water pollution and the maintaining or restoring
·of wholesomeness of water, for the establishment of Board for the
prevention and control of water pollution. Under the provisions of the
Act the State Pollution Control Board constituted to carry out func-
-
tions prescribed under Section 17 oi-.the Act which among other things
F provide that the Board shall inspect sewage or trade effluents and
plants for the treatment of sewage and trade effluents and to review
plans, specifications or other data set up for the treatment of water and
to lay down standards to be co,iiplied with by the persons while causing
discharge of sewage or sullage. Section 24 of the Act provides that no
person shall knowingly cause or permit any poisonous, noxious or
(} polluting matter to enter into any stream or well which may lead to a
substantial aggravation of pollution. The petitioner has asserted that
Tata Iron and Steel Co.-respondent No. 5 carries on mining opera-
tion in coal mines/washeries in the town of Jamshedpur. These coal
mines and collieries are known as West Bokaro Collieries and the
Collieries have two coal washeries where the coal after its extraction
H from the mines is broug~t and broken into graded pieces and there-
SUBHASH v. STATE OF BIHAR [SINGH, J.) 9
after it is processed for the purpose of reducing its ash contents. A
chemical process is carried out which is known as 'froth floatation A
) process'. Under this process the graded coal is mixed with diesel oil,
pine oil and many other chemical ingredients and thereafter it is
washed with the lacs of gallons of water. The end water is washed coal
with reduced quantity of ash content fit for high graded metallurgical
process for the purposes of manufacture of steel. In the process of B
washing large quantity of water is discharged through pipes which
carry the discharged water to storage ponds constructed for the
J,_ purpose of retaining the slurry. Alongwith ·the discharged water, small
particles of coal are carried away to the pond where the coal particles
settle down on the surface of the pond, and the same is collected after
-r the p_ond is de-watered. The coal particles which are carried away by
.... the water is cafled-the slurry which is ash free, it contains fine quality
of coal which is used as fuel.
c
c
The petitioner has alleged that the surplus waste in the form of
d.1 sludge/slurry is discharged as an effluent from the washeries into the
• Bokaro river which gets deposited in the bed of the river and it also D
gets settled on land including the petitioner's land Searing Plot No.
170. He has further alleged that the sludge or slurry whicn gets de-
posited on the agricultural land, is absorbed by the land leaving on the
top a fine carbonaceous product or film on the soil, which adversely
affects the fertility of the land. The petitioner has further alleged that
,;......, · the effluent in the shape of slurry is flown into the Bokaro river which E
is carried out by the river water to the distant places polluting the river
water as a result of which the river water is· not fit for drinking
- purposes nor it is fit for irrigation purposes. The continuous discharge
of slurry in heavy quantity by the Tata Iron & Steel Co. from its
washeries posing risks to the health of people living in the surrounding
areas and as a result of such discharge the problem of pure drinking F
~ water has become acute. The petitioner has asserted that inspite of
f several representations, the State of Bihar and State Pollution Control
Board have failed to take any action against the Company instead they
have permitted the pollution of the river water. He has further averred
that the State of Bihar instead of taking any action against the Com-
pany has been granting leases on payment of royalty to various persons G
for the collection of slurry. He has, accordingly, claimed relief for
issue of direction directing the respondents which include the State of
-----....;' Bihar, the Bihar Pollution Control Board, Union of India and Tata
Iron & Steel Co. to take immediate steps prohibiting the pollution of
the Bokaro river water from the discharge of slurry into the Bokaro
river and to take further action under provisions of the Act againt the H
Tata Iron & Steel Co.
10 SUPREME COURT REPORTS (1991] 1 S.C.R. ....
The respondents have contested the petition and counter-
A affidavits have been filed on behalf of t_he respondent Nos. 2, 4 and
5-State of Bihar,' State Pollution Board, Directors of Collieries a_nd
Tata Iron & Steel Co. Ltd. In the counter-affidavits filed on behalf of
the respondents, the petitioner's main allegation that the sludge/slurry
is being discharged into the river Bokaro causing pollution to the water
B and the land and that the Bihar State Pollution Board has not taken
steps to prevent the same is denied. In the counter-affidavit filed on
behalf of the Bihar State Pollution Board it is asserted that the Tata
Iron & Steel Co. operates open case and underground mining. The
Company in accordance to Sections 25 and 26 of the Water (Preven-
tion and Control of Pollution) Act, 1974 applied for sanction from the
Board to discharge their effluent from their outlets. The Board before
c granting sanction analysed their effluent which was being watched
constantly and monitered to see that 'the discharge does not affect the
water quality of the Bokaro river adversely. In order to prevent the
pollution the Board issued direction to the Director of the Collieries to
take effective steps for improving the quality of the effluent going into
D the Bokaro river. The State Pollution Board imposed conditions
requiring the Company to construct two settling tanks for settlement
ofsollds and rewashing the same. The Board directed for the' regular
samples being taken and tested for suspended solids and for the com-
munic~tion of the results of the tests to the Board each month. The
State Board has asserted that the Company has constructed four ponds
ensuring more- storing capacity of effluent. The Pollution Board has
been monitoring the effluent. It is further stated that on the receipt of
the notice of the instant writ petition the Board carried out an inspec-
tion of the settling tanks regarding the treatment of the effluent from
the washeries on 20th June, 1988. On inspection it was found that all
-the four settling tanks had already been completed and work for
-
F further strengthening of the embankment of the tanks was in progress,
and there was no discharge of effluent from the washeries into the
river Boka:o except that there was negligible seepage from the
embankment. It is further stated that the Board considered all the
aspects and for further improvement it directed the management of the
collieries for removal of the settled slurry from the tanks. The Board
':G has directed that the washeries shall perform desludging of the settling
tanks at regular intervals to achieve the proper req-uired retention time
.... for _the separation of solids and to achieve discharge of effluents within
the standards prescribed by the Board. It is further asserted that at
present there is no discharge from any of the tanks to the Bokaro river
and thei"e is no question of pollution of the river water or affecting the
fertility of land. In their affidavits fiied on behalf of the respondent
SUBHASH v. STATE OF BIHAR [SINGH, J.) 11
Nos. 4-and 5, they have aiso denied the allegations made in the peti-
I tion. They have asserted that the effective steps have betm taken to A
~ prevent the flow of the water discharge from the .washeries into the
river Bokaro. It is stated that intact river Bokaro remains dry during 9
months in a year and the question of pollution of water by discharge of
slurry into the river does not arise. However, the management of the
washeries have constructed from different ponds to store the slurry. B
The slurry which settles in the ponds is collected for sale. The slurry
contains highly carbonaceous materials and it is considered very valu-
able for the purpose of fuel as the ash contents are almost. nil in the
coal particles found in the slurry. Since, it has high market value, the
Company would not like it to go in the river water. The Company has
-
taken effective steps to ascertain that no slurry escapes from its ponds
as the slurry is highly valuable. The Company has been following the c
directions issued by the State Pollution Control Board constituted
under the 1974 Act.
1 On the facts as appearing from the pleadings and the specific
averments contained in the counter-affidavit filed on behalf of the D
State Pollution Control Board of Bihar, prima facie we do not find any
good reason to accept the petitioner's allegation that the water of the
river Bokaro is being polluted by the discharge of sludge or slurry into
it from the washeries of the respondent-company. On the other hand
we find that the State Pollution Control Board has taken effective
steps to check the pollution. We do not consider it necessary to delve JE
into greater detail as the present petition does not appear to have been
-
filed in public interest instead the petition has been made by the
petitioner in his own interest.
On a perusal of the counter-affidavit filed on behalf. of the
respondent Nos. 4 and 5 it appears that the petitioner has been F
purchasing slurry from the respondent Nos. 4 and 5 for the last several
years. With the passage of time he wanted more and more slurry, but
the respondent-company refused to accept his request. The petitioner
is an influent•al businessman, he had obtained a licence for coal trad-
ing, he tried to put pressure through various sources on the res-
pondent-company for supplying him more quantity of slurry but when G
the Company refused to succumb to the pressure, he started harassing
the Company. He removed the Company's slurry in an unauthorised
manner for which a Criminal Case No. 173 of 1987 under Sections 379
and 411 of the Indian Penal Code read with Section 7 of the Essential
Commodities Act was registered against the petitioner and Pradip
Kumar his brother at Police Station Mandu, which is pending before H
12 SUPREME COURT REPORTS [1991] 1 S.C.R.
the Sub-Judge, Hazaribagh. One Shri Jugal Kishore Jayaswal also
A
filed a criminal complaint under Section 379 and 411 of the IPC against
the petitioner and his brother Pradip Kumar in the Court of Judicial
Magistrate, First Class, Hazaribagh, which is also pending before the
Court of Judicial Magistrate, 2nd Class Hazaribagh. The petitioner
initiated several proceedings before the High Court of Patna under
B Article 226 of the Constitution for permitting him to collect slurry
. from the Raiyati land. These petitions were dismissed on the ground of
_existence of dispute relating to the title of the !_ancl.. The petitioner filed
a writ petition C.W.J.C. No. 887 of 1990 in the High Court of Patna for
taking actio-n against the Deputy Commissioner, Hazaribagh for
implementing the Full Bench judgment of the Patna High Court in
C - Kundori Labours Cooperative Society Ltd. & etc. etc. v. State of B_ihar
& Ors., AIR 1986 Patna 242 wherein it was held that the slurry was •
neither coal nor mineral instead it was an industrial waste of coal mine,
not subject to the provisions of the Mines and Mineral (Regulation and
Development) Act, 1957. Consequently the collection of slurry which
escaped from the washeries could be settled by the State Government T
I) with any person without obtaining the sanction of the Central Govern-
ment. The petitioner has been contending before the High Court that
the slurry which was discharged from washeries did not belong to the
Company and he was entitled to collect the same. Since the res-
pondent-company prevented the petitioner from collecting slurry from
its land and as it further refused to sell any additional quantity of slurry
E to him, he entertained grudge against the respondent-company. In
order to feed fat his personal grudge he has taken several proceedings
against the respondent-company including the present proceedings.
These facts are quite apparent from the pleadings of the parties and
the documents placed before the Court. Infact, there is intrinsic evi-
dence in the petition itself that the primary purpose of filing this peti-
F tion is not to serve any public interest instead it is in self-interest as
would be clear from the prayer made by the petitioner in the interim
stay application. The petitioner claimed interim relief from this Court
,-
permitting him to arrest/collect sludge/slurry flowing ·out of the
washeries of the respondent Nos. 4 and 5 and with a direction to the
State of Bihar, its officers and other authorities for not preventing him
G from collecting the sludge/slurry and transporting the same. The
prayer_ for the interim relief made by the petitioner clearly indicates
that he is interested in collecting- the slurry and transporting the same
for the purposes of his business. As already stated a Full Bench of the
Patna High Court held that the slurry was not coal and the provisions
of the Mines and Mineral (Regulation and Development) Act, 19_57
H were not applicable, the State Government was free to settle the same
SUBHASH v. STATE OF BIHAR [SINGH, J.] 13
and the Tata Steel_& Iron Co. had no right to collect the slurry which
A
escaped from its washeries. The respondent-company filed an appeal
before this Court. During the pendency of the aforesaid appeal, the
petitioner filed the present petition. The appeal preferred by the Tata
Iron & Steel Co; Ltd. and Bharat Coking Coal Ltd. was allowed by
this Court and the judgment of Patna High Court was set asid·e. The
judgment of this Court-is reported in Judgments Today Vol. 3 1990 SC B
533 wherein it has been held that the slurry/coal deposited on any land
, continues to be coal and the State Government has no authority in law
~~-, .to deal with the same and the slurry deposited on the Company's land
belongs to the Company and no other person had authority to collect
the same.
Article 32 is designed for the enforcement of Fundamental c
Rights of a citizen by the Apex Court. It provides for an extraordinary
procedure to safeguard the Fundamental Rights of a citizen. Right to
live is a fu~damental r4ght under Art 21 of the Constitution and it
l includes the right of enjoyment of pollution free water and air for full
enjoyment of lite. If anything endangers or impairs that quality of life D
in derogation of law.s, a citizen has right to have recourse to Art. 32 of
the Constitution for removing the pollution of water or air which may
be detrimental to the quality of life~ A petition under Art. 32 for the
prevention of pollution is maintainable at the instance of affected
persons or even by a group of social workers or journalists. But
recourse to preceeding under Art. 32 of the Constitution should be E
taken by a person genuinely interested in the protection of society on
behalf of the ·community. Public interest litigation cannot be invoked
by a person or body or person to satisfy his or its personal grudge and
enmity. If such petitions under Article 32, are entertained it would
amount to abuse of process of the Court, preventing speedy remedy to
other genuine petitioners from this Court, Personal interest cannot be F
enforced through the process of this Court under Art. 32 of the Con-
stitution in the garb of a public interest litigation. Public interest litiga-
tion contemplates legal proceeding for vindication or enforcement of
fundamental rights of a group of persons pr community which are not
able to enforce their fundamental rights on account of their incapacity,
poverty or ignorance of law. A person invoking the jurisdiction of this G
Court under Art. 32 must approach this Court for the vindication of
the fundamental rights of affected per11ons and not for the purpose of
vindication of his personal grudge or enmity. It is duty of this Court to
discourage such petitions and to ensure that the course of justice is not
obstructed or polluted by unscrupulous litigants by invoking the extra~
ordinary jurisdiction of this Court for personal matters under the garb H
14 SUPREME COURT REPORTS [ 1991] 1 S.C.R.
A of t~e eublic interest litigatio? see Bandhua Mukti Morcha v. Union of
India, [1984] 2 SCR 67; Sachmdanand Pandey v. State of West Bengal,
[ 1987] 2 SCC 295 at 331; Ramsharan Autyanuprasi & Anr. v. Union of
India & Ors., [ 1989] Suppl. 1 SCC 251 and Chhetriya Pardushan Mukti
Sangharsh Samiti v. State of U. P. & Ors., [ 1990] 4 SCC 449.
B
In view of the above discussion we are of the opinion that this
petition has been filed not in any public interest but for the petitioner's
personal interest and for these reasons we dismissed the same and
directed that the petitioner shall pay Rs. 5,000 as costs. These costs are
to be paid to the respondent Nos. 3, 4 & 5.
T.N.A. Petitions dismissed.