COAL INDIA LID. AND ORS.versusDOMCO SMOKELESS FUELS (P) LID.
- Citation
- 2007 INSC 587
- Decided
- 15 May 2007
- Disposal
- Appeal(s) allowed
- Bench
- S B SINHA
Holding
The Supreme Court allowed the appeals and remitted the dispute to the High Court for fresh consideration, as the pleadings were incomplete and further factors needed assessment.
Summary
Domco Smokeless Fuels set up a smokeless fuel plant based on Coal India Ltd's advertisement promising assured coal linkage. The unit was initially linked to Bharat Coking Coal Ltd (BCCL) but sought transfer to Central Coalfields Ltd (CCL) following a policy decision to rationalise linkages. Coal India denied the transfer, granting only a temporary 50% supply, leading Domco to file a writ petition which the Jharkhand High Court allowed, directing full transfer. Coal India appealed, arguing that the entitlement must be traced to the Coal Control Order, 2000 and that the petitioner had not pleaded how it derived a legal right, raising issues of promissory estoppel and discrimination. The Supreme Court, noting the absence of pleadings and subsequent events such as inspection reports and policy changes, held that it could not decide the merits and remitted the matter to the High Court for fresh consideration, allowing the appeals.
Issues considered
- The legal right of an entrepreneur to a permanent coal linkage and its transfer under the Coal Control Order, 2000.
- Whether the doctrine of promissory estoppel applies to the promise made in Coal India's advertisement.
- Whether Coal India's policy decision to treat linkages as permanent amounts to discrimination against the petitioner.
- Whether the High Court can decide the matter in the absence of detailed pleadings and in view of subsequent events.
Subjects
Judgment
). COAL INDIA LID. AND ORS. A
v.
DOMCO SMOKELESS FUELS (P) LID.
MAY 15, 2007
[S.B. SINHA AND MARKANDEY KA TJU, JJ.] B
Coal-Setting up smokeless fuel unit on assurance of supply of coal-
r -,_.. Coal linkage-Transfer of-Sought by the unit-Denial thereof--Cha//enged-
Direction for transfer by High Court-Appeals to Supreme Court-During
pendency of appeals, certain subsequent events taking place-Held : Matter c
remitted to High Court in view of subsequent events and since in absence of
.... pleading made before High Court it is not clear as to whether the entrepreneur
had made averments as to how he derived legal right for transfer of linkage-
Coal Control Order, 2000-Clause 6.
D
Respondent had set up a unit for production of smokeless fuel, on a
representation made by the appellant by way of an advertisement inviting new
• entrepreneurs to set up new smokeless fuel units wherefor supply of coal to
them was assured. Respondent was given coal linkage with the collieries
T belonging to Bharat Coking Coal Ltd. (BCCL) a subsidiary of Coal India Ltd.
(CIL). In a meeting, it was decided to review the linkage of SSF plants in order E
to rationalize the linkage so that the units would get their supplies from the
nearest suitable sources containing SSF grade coal.
On the basis of decision in the meeting, respondent applied for transfer
of his linkage from BCCL to Central Coalfields Ltd. (CCL). The same was
denied in view of its policy that once it is accorded, the same would be F
permanent in nature. However, temporary transfer of linkage to the extent of
JI
y
50% of the quantity was given to the respondent and also to one other
company. The order of temporary transfer was questioned by the respondent
in Writ Petition. Pending Writ Petition, CIL granted permanent change of
linkage in favour of the other company, but not to the respondent, despite the G
fact that CCL had given 'No Objection' certificate to both the units by a
common letter. The Writ Petition was allowed by High Court directing the
appellant to transfer the linkage of coal from BCCL to CCL. Hence the
-'>: present appeals.
787 H
788 SUPREME COURT REPORTS (2007) 6 S.C.R.
A During pendency of the appeals, pursuant to order of this court, the unit
of the respondent was inspected and report thereof was filed. In the meantime,
the question of linkage vis-a-vis, the changed policy decision of Coal India
Ltd. to sell coal on e-auction was considered by this Court.
Allowing the appeals and remitting the matter to High Court, the Court
B
HELD: 1. Whereas the entitlement of the entrepreneur must be traced
to the policy decision of the Coal India Ltd. and the directions issued by the
Central Government from time to time in exercise of its power under Clause
6 of the Coal Control Order, 2000, the respondent also was required to make . ~
~
necessary averments therefore in its writ petition as to how it had derived a
c legal right in regard to transfer of linkage. The pleadings of the parties are
-1..
not before this court. Certain subsequent events have also taken place. Even
if the respondent becomes entitled to the reliefs prayed for herein, an
opportunity in that behalf is required to be given to the appellant also.
Respondent has raised before this court questions of discrimination which is
D also required to be gone into. One of the questions which would thus, arise
for consideration would be as to whether the CIL's policy decision would be
covered by the earlier policy decision having regard to the doctrine of
promissory estoppel. Several other factors have been brought on record in •
the light of the inspection report submitted before this Court. It is not possible
for this court to go into the said question particularly in absence of the
E pleadings of the parties. (Paras 20 and 21) (798-A, B, C, DJ
2. Therefore, interest of justice shall be subserved ifthe High Court is
directed to consider the matter afresh. The parties shall be entitled to file
additional affidavits in the writ proceeding. Respondent may in view of the
subsequent events amend its writ petition. In such an event, the High Court
F would not only consider the matter from the perspective of the original prayer
made in the writ petition, but also the reliefs which may be found to be available
to the respondent in view of the subsequent events including the Report of the ..
Inspection Committee. [Para 22) (798-E, F) ·--r
G CIVIL APPELLATE JURISDICTION: Civil Appeal No. 816 of2001.
From the Judgment and Order dated 14.10.1999 of the High Court of
Judicature at Patna Ranchi Bench, Ranchi in LP.A. No. 415/1999 (R).
WITH ~-
H
COAL lNDlA LID. v. DOMCO SMOKELESS FUELS (P) LTD. [S.B. SINHA, J. ] 789
--:-
>- Civil Appeal No. 817/2001 & Contempt Petition (Civil) Nos. 547-548/ A
2002.
Vikas Singh, ASG, P.P. Rao, Sr. Adv., Anip Sachthey, Mohit Paul, Arijit
Prasad, Krishan Mahajan, R.S. Rana, V.K. Venna, Rana Mukherjee, S. Chandra
Shekhar. Amit Kumar, Krishnanand Pandeya for the appearing parties.
B
The Judgment of the Court was delivered by
S.B. SINHA, J. I. These appeals are directed against the Order of a
~·
learned Single Judge of the Jharkhand High Court dated 9.7.1999, an Order
~ dated 9.8.1999, Order dated September, 1999, an Order dated 23.9.1999 as also
Order of a Division Bench 14.10.1999 passed in LPA No. 415 of 1999 (R) c
refusing to interfere with the order impugned in the writ petition passed by
the learned Single Judge of the said Court allowing the writ petition filed by
the respondent. The basic fact of the matter is not in dispute. Respondent
herein has set up a unit for production of smokeless fuel. The said Industry
was set up by the respondent allegedly on a representation made by the
D
appellant herein by way of an advertisement inviting new entrepreneurs to set
up new smokeless fuel units wherefor supply of coal to them was assured,
~
which is to the following effect:
)I "Say "no" to Smoke
Do you know? The smoke emitting from your chullahs is causing
E
serious air Pollution endangering the air that your child breaths.
SPECIAL SMOKELESS FUELS (SSF)
an economic substitute for the smokey soft coke and firewood,
generates consistent heat thus enconomizing fuel consumption. Its F
unifonn size also ensures convenient storage. Use of SSF will reduce
>
widespread chopping of tree for firewood and present deforestation.
~
Coal India now on a mission to minimize environmental pollution and
encourage aforestation, invites entrepreneurs to set up new SSF units
and expand existing ones. 8 SSF units are already on stream. CIL has
G
.... already cleared linkages for 80 units CIL will soon be finalizing linkages
for 25 more units.
-~
CIL will provide additional coal requirements for expansion of SSF
units and coal linkages for the new entrepreneurs. Write to us through
State Sponsored Authorities. H
790 SUPREME COURT REPORTS (2007) 6 S.C.R.
-..
A For further details contact : CMPDIL, Ranchi/Technical Cell, Coal .....
India Ltd. JO Netaji Subhash Road, Calcutta-70000 I, Tel: 206312, 207817
Western Coalfields Ltd. Bharat Coking Coal Ltd.
-·--
Central Coalfields Ltd. Eastern Coalfields Ltd.
B
South Eastern Coalfields Ltd. North Eastern Coalfields''
2. Respondent applied for grant of linkage facility for obtaining supply
of coal in its industrial unit situated in the District of Aurangabad in the State
A.
of Bihar. It was given coal linkage with the collieries belonging to Bharat
c Coking Coal Ltd, (BCCL) a subsidiary of Coal India Ltd.
3. On or about 17.11.1993 in a meeting wherein the authorities of the
Coal India Ltd., a subsidiary of BICICO and the Secretary of the Assessing
Manufactures Association participated, it was decided.
D "(a) SOURCE OF COAL LINKAGE
It was decided that the linkage of the SSF plants will be reviewed
by CIL keeping in view the present availability of coal suitable for SSF
production and rationalization of linkage would be considered to the
extent possible so that the units get their supplies from the nearest
E suitable sources containing SSF grade coal.
In this connection, BICICO would submit a statement to CIL
giving their suggestions for linkage of coal to the new SSF units in
Bihar."
F 4. Respondent applied for transfer of his linkage from BCCL to Central
Coalfields Ltd.(CCL) in terms of the said decision taken in the aforementioned
'
meeting dated 17 .11.1993, pointing out that construction of the factory was
"!'
taken up only on the basis of the assurances made by the Coal India Ltd. in
that behalf. Although, some industries allegedly similarly situated, were given
G the benefit of transfer of their linkage from BCCL to Central Coalfields Ltd.,
by the appellant, the request of the respondent was not acceded to despite
a "No objection" to the change given by the CCL. Coal India Ltd. referred
to the purported policy decision in regard to linkage to the effect that, once
it is accorded, the same would be permanent in nature. However, temporary ~-
transfer of linkage to the extent of 50% of the quantity were given both to
H the respondent as also one Mis. Pushpanjali Coal and Coke.
COAL INDIA LTD. 1·. OOMCO SMOKELESS FUELS (Pl LTD. [S.B. SINHA, J.] 791
>- 5. Coal India Ltd., however, issued a direction on or about 9. I0. l999 that A
the respondent would be given 50% of its supply for three months from BCCL
and 50% from CCL The legality of the said decision was questioned by the
respondent in a Writ Petition filed before the High Court of Jharkhand praying
therein that the appellant be directed to release full quota of coal by grant
of change of linkage from BCCL to CCL Pending Writ Petition. however. CIL
granted permanent change of linkage in favour of Mis. Pushpanjali Coal and B
Coke but not to the respondent, despite the fact that CCL had given "No
Objection" to both the units by a common letter dated 17.7.1998.
~
6. The said Writ Petition was allowed by a learned Single Judge of the
High Court inter-alia directing;
c
" .. Now the respondent CIL came out with a case in the counter
affidavit that the officers of the CIL in its meeting held on 3.9.98 took
a policy decision that linkage once granted, cannot be transferred
from one subsidiary to another subsidiary of C!L
9. After going through the entire facts of the case and the documents D
referred to hereinabove, it is manifest that non-acceptance of the
,,,,
request of the petitioner by CIL is arbitrary and not reasonable
particularly when no valid reason has been assigned for not accepting
>. the request of the petitioner, more so, when the case of Mis Pushpanjali
Coal & Coke Pvt. Ltd. was considered and his linkage was transferred E
from BCCL to CCL Nowhere in the counter affidavit the respondent-
CIL has denied the difficulty that the petitioner-unit is facing and will
have to face and the loss which the petitioner-unit will sustain in
procuring coal from BCCL which is far away from the place where the
Plant has been established. Moreover, after considering the
recommendation from the State Government and the BICICO and after F
,, obtaining no objection from the C.C.L., there is no reason for the
~
respondents to ignore the request of the petitioner. It is well settled
that when the industries are established the Central Government or
the State Government and its instrumentalities while framing industrial
policies and taking policy decisions in lite matter in the matter supply
G
ofraw materials or granting different incentives, the objective must be
to encourage the unit."
->. 7. It was directed;
"11. Having regard to the facts and circumstances of the case and the
H
792 SUPREME COURT REPORTS (2007] 6 S.C.R.
A discussions made hereinabove, this writ application is disposed of .....
with a direction to the authority of the respondent-C.I.L. to take a
liberal and positive decision in the case of the petitioner also in the
light of the direction and observation made above. Such decision
must be taken within a period of two weeks from the date of receipt/
production of a copy of this order."
B
8. An application for clarification was filed by the respondent inter alia
praying for issuance of a writ of or in the nature of mandamus upon giving
a positive direction to the appellant to supply coal to its unit only from the
collieries belonging to Central Coalifields Ltd. The said application was ..(
disposed of by an Order dated 9.8.1999 observing;
c
"In my opinion, the application filed by the petitioner is misconceived
inasmuch as there is sufficient indication in the order that the
respondent shall take a positive decision in the light of the fact that
in similar circumstances the prayer for transfer of linkage made by
Mis Pushpanjali Coal and Coke Pvt. Ltd. has been allowed. It is also
D
clear from para. 5 of the judgment that this Court has held that non-
acceptance of the request of the petitioner by C.l.L. is arbitrary and
not reasonable.
In view of the sufficient indication in the order directing the
E respondents to take positive decision in favour of the petitioner, I am
of the view that no further clarification is needed in this order. The
submission of Mr. Sinha that if the order is not clarified, the respondents
C.l.L. may not take decision in favour of the petitioner, cannot be
accepted for the reason that this Court virtually, in the order dated
9.7.99, directed respondents to transfer the linkage as prayed for by
F the petitioner.
This application is accordingly, disposed of with the aforesaid
.
'(
observation."
9. Application of the respondent, was thus, rejected. On the
G aforementioned premise, a review application was filed by the appellant which ...
was also rejected opining:
"From reading of the entire facts it appears that there are many other
f_-
considerations for granting linkage of coal to various suppliers which
can be brought into light if the entire documents are called for from
H the C.l.L. But, at this stage, I do not want to make a roving enquiry
COAL INDIA LTD."· OOMCO SMOKELESS FUELS (P) LTD. [S.B. SINHA,J] 793
into the matter. Suffice it to say that Mr. S.M. Sharma should act fairly A
so that if anything is brought to the notice of this court in any other
case, then he may not be put in trouble.
Curiously enough the Director of Industries Govt. of Bihar, by its
letter dated 20.8.99 addressed to the Sales Manager, CIL, informed
that temporary registration granted to certain firms have been cancelled B
but inspite of that respondents have granted linkage to those firms
from CCL vide their order dated 25.8.99, a copy of which has been
annexed as Annexure I/A to the rejoinder.
)..
It is also surprising that the respondents have taken a negative
decision and thereby refused to comply the direction of this court c
merely on the ground that many other consumers will come for such
relief. In my opinion, that cannot be a ground for disobeying the order
and direction passed by this court.
However, in view of very fair stand taken by Mr. Banerjee appearing
D
for the respondents that the respondents shall re-consider the case
,J
of the petitioner in the light of the judgment dated 9. 7. 99 and the
subsequent order dated 9.8.99 and will take a positive decision, I am
disposing of the instant application and its rejoinder by observing
.>
that the respondents must comply the order and direction of this court
within ten days from the date of receipt of a copy of this order." E
10. A Letters Patent Appeal was filed thereagainst by the appellant
which by reason of the impugned judgment dated 14.10.1999 has been
summarily dismissed. As no Letters Patent Appeal was filed as against the
original order of the learned Single Judge dated 9.7.1999, an application under
Article 136 of the Constitution has directly been filed in this Court thereagainst
F
. .,.. which has been marked as SLP(C) No. 17145/2000 .
I I. A Division Bench of this Court while staying the operation of the
impugned judgment, directed the appellant to consider the case of the
respondent in terms of the letter dated 14.2.2000. G
12. Grievances were raised by the respondent from time to time before
the Court that the appellant had not been supplying the requisite quantity of
-);. coal to its unit whereupon various orders have been passed whereto we need
not refer at this stage. Suffice, however, it to notice that some contempt
petitions were also filed. Another Division Bench of this Court by an Order H
dated 29. I .2004 observed;
794 SUPREME COURT REPORTS 12007) 6 S.C.R.
A "We have heard the learned counsel for the parties for sometime.
After some discussion, the learned counsel for the appellants submitted
that he may be allowed a reasonable time for having instructions and
making a proposal on two poi_nts:
(i) Clearing the arrears of supply of coal to; and
B
(ii) Rationalising policy as to linkage for future.
Let a statement in that regard be made on an affidavit under copy
to the counsel opposite on or before 24th February, 2004.
_J..
Response, if any and if needs to be filed in writing may be done
c on or before 16th March, 2004.
The above said statement and response shall be treated without
prejudice to the rights of either parties.
List for hearing on 23rd March, 2004."
D
13. When the matter came up for hearing before another Bench of this
Court on 17 .8.2006, it was directed; ..
"The respondent (s) herein shall furnish within four weeks from
,(
date, bank guarantee and security in regard to the difference in the
E prices, if any, of coal which had already been supplied to them by the
Coal India Ltd. in terms of the directions of this Court in Mis. Ashoka
Smokeless Coal Industries Pvt. Ltd & Ors. v. Union of India & Ors.
(SLP(C) No. 20471 /2005). The appellant shall issue necessary directions
to the Central Coalfields Ltd. for supply of coal to the respondent's
F factory from any of the collieries situated within its jurisdiction subject,
of course, to the availability as also the guidelines and the circulars
issued by the Central Government, if any. Only in the event, it is not •
possible for the CCL to supply coal, offer to supply coal may be made ""(
from the collieries belonging to the BCCL.
G Keeping in view the facts and circumstances of this case, we are
of the opinion that Union of India should be impleaded as party. On
an oral prayer made by the learned counsel Mr. Sachthey, Union of
India is made a party through the Ministry of Coal. Mr. Sachthey
assures us that a copy of the paper book of this case shall be handed f-
H over to the Central Agency.
COAL INDIA LTD. ,._ DOMCO SMOKELESS FUELS (P) LTD. [S.B. SINHA,!. ] 795
Counter affidavit by the Central Government may be filed within A
four weeks from date. Liberty to menti~n, if any occasion arises
therefor.
We would also direct that an officer of the Coal India Ltd. shall
visit the factory of the respondent so as to assess the actual present
need of coal by it whereupon the difficulties, if any, in making supply B
thereof from any of the collieries belonging to the Central Coalfields
Ltd. may be deliberated upon in a meeting which may be convened
by Coal India Ltd. with officer(s) of the Bharat Coking Coal Ltd.,
Central Coalfields Ltd. and a representative of the respondent (s).
~
Put up on 10th October, 2006. c
On the next date of hearing, an officer of the Coal India Ltd.
having full instructions in the matter, and a representative of the
respondent shall remain present in Court."
14. Pursuant to the said Order, the unit of the respondent had been D
inspected and a report has been filed with an affidavit affirmed by the General
Managers of Coal India Ltd. on I 8. I0.2006.
~
15. Respondent filed an objection to the said report. A rejoinder thereto
> has alsQ been filed by the appellant herein. In the meantime, the question of
linkage vis-a-vis, the changed policy decision of Coal India Ltd. to sell coal E
on e•auction was considered by a Bench of this Court in Mis. Ashoka
Smokeless Coal Ind P. Ltd & Ors. v. Union of India & Ors., (2006) 13 SCALE
102, wherein inter-alia it was observed:
"190. Coal being a scarce commodity, its utility for the purpose for
which it is needed is essential. Although, technically, in view of the F
fact that no price is fixed for coal, there may not be any black marketing
• -.....- in the technical sense of the terms; but this Court cannot also
encourage black marketing in general sense. Nobody should be allowed
to take undue advantage while dealing with a scarce commodity. The
very fact that despite best efforts of the Central Government, the coal
G
companies failed to curb the menace of a section of people and to deal
in coal excluding other general people therefrom or the linked
consumers misusing their position of obtaining allotment of coal either
- ): wholly or in part, it is absolutely necessary that some mechanism
should be found out for plugging the loopholes. The Union of India
or the coal companies appear to have lost confidence in the State H
796 SUPREME COURT REPORTS [2007) 6 S.C.R.
,.
•
A Governments. They had carried out joint inspection and in that process ...
they must have arrived at a satisfaction about the genuineness of the
claims of industrial units for which the linkage system was meant for.
191. Before us most of the consumers, with a view to obtain supply
of coal had filed documents to prove their genuineness. The said
B documents must be scrutinized by the authorities of the coal
companies. In the event, they have an suspicion, inspection should
be carried out by officers appointed by the Chairman-cum-Managing
Director of the concerned company within whose jurisdiction the unit
is situated. .
c 192. With a view to evolve a viable policy, a committee should be ""
constituted by the Union of India with the Secretary of Coal being the
Chairman. In such a committee, a technical expert in coal should also
be associated as most of the projects involve consumers of coal,
particularly manufacturel'SI of hard coke and smokeless fuel. In our
opinion, it may not be difficult to find out, having regard to the
D technologies used therein as regards the ratio of the input vis-a-vis
the output, with a balance and 10% margin. On the basis of such
finding alone, apart from the requirements of five years, supply should ..
form the basis of MPQ. We may, however, hasten to add that the
Central Government in collaboration with the coal companies would ,(
E be at liberty to evolve a policy which would meet the requirements of
public interest vis-a-vis the interest of consumers of coal. They would
be entitled to lay down such norms as may be found fit and proper.
They would be entitled to fix appropriate norms therefor. In the event,
any industrial unit is found to violate the norms, it should be
stringently dealt with."
F
16. It is stated by the learned Additional Solicitor General appearing on
behalf of the Union of India that pursuant to the said direction, a Committee ._,,.
..
has been constituted and it is expected that a repprt would be submitted
within a few weeks. It is, however, not necessary for us to consider that
aspect of the matter. Mr. Anip Sachthey, learned counsel appearing on behalf
G of the appellant inter-alia would submit that the High Court committed a
manifest error in issuing a Writ of Mandamus directing the appellant to
transfer the linkage of coal from BCCL to the CCL Drawing our attention to
the report of the Committee, it was submitted that keeping in view the shortage f-
of coal faced by Central Coalfields Ltd., such a direction would cause enormous
H difficulties in working out of the linkage system itself. It was further submitted
COAL INDIA LTD. 1·. OOMCO SMOKELESS FUELS (P) LTD. [S.B. S!NHA, 1 ] 797
that even on fact. the respondent cannot be said to have a good case as from A
Bahri, the distance of the collieries belonging to Central Coalfields Ltd. and
Bharat Coking Coal Ltd. are almost same.
17. Mr. P.P. Rao, learned senior counsel appearing on behalf of the
respondent. on the other hand, submitted;
B
(i)ln view of the 'No Objection' granted by CCL, it is not now
permissible for the appellant to suggest that supply of coal from
Central Coalfields Ltd. would cause enormous difficulty to it.
~ (ii) Having regard to the clear representation made by the Coal India
Ltd., in its advertisement of 1987 as also the minutes of meeting held c
on I 7. I I. I993 pursuant whereto and in furtherance whereof, the
appellant altered its position by investing a huge amount by setting
up its industry of smokeless fuel, the doctrine of promissory estoppel
shall apply in the instant case.
(iii) In the light of the provisional decision taken by CIL in the matter D
of grant of supply of coal i.e. 50'Yo from BCCL and 50% from CLL, the
J High Court cannot be said to have exceeded its jurisdiction in directing
the appellant to take a final decision in the matter having regard to
the immense difficulties which are being faced by the respondent as
> also the financial implication attaching thereto.
E
(iv) Appellant being a 'State' within the meaning of Article 12 of the
Constitution of India was enjoined with a duty to exercise its
jurisdiction in a reasonable manner
(v) When an opportunity had been granted to a State to correct an
error in the matter of exercise of its discretionary jurisdiction, the High F
.. Court in a given case may issue a Writ of Mandamus also .
~ 18. In Mis. Ashoka Smokeless (supra), this Court has in details discussed
the validity or otherwise of the linkage scheme vis-a-vis the changed policy
decision of the Coal India Ltd. for selling coal on e-Auction. While arriving
at the said decision, this Court has also taken into consideration various G
aspects of the matter including applicability of the doctrine of promissory
estoppel in a case of this nature.
- ): 19. The question, however, is whether in a case of this nature and
particularly having regard to the subsequent materials which have been brought
H
798 SUPREME COURT REPORTS [2007] 6 S.C.R.
A on records, the respondent was entitled to the reliefs prayed for by it or not.
20. We have noticed hereinbefore the orders passed by the learned
Single Judge from time to time. Whereas The entitlement of the entrepreneur
must be traced to the policy decision of the Coal India Ltd. and the directions
issued by the Central Government from time to time in exercise of its power
B under Clause 6 of the Coal Control Order, 2000, the respondent also was
required to make necessary averments therefore in its writ petition as to how
it had derived a legal right in regard to transfer of linkage. The pleadings of
the parties are not before us. We have noticed hereinbefore that certain
subsequent events have also taken place. Even if the respondent becomes
C entitled to the reliefs prayed for herein, an opportunity in that behalf is
required to be given to the appellant also. Respondent has raised before us
questions of discrimination which is also required to be gone into. One of the
questions which would thus, arise for consideration would be as to whether
the CIL's policy decision would be covered by the earlier policy decision
having regard to the doctrine of promissory estoppel.
D
21. Several other factors as noticed hereinbefore have been brought on
record in the light of the inspection report submitted before this Court. It is
not possible for us to go into the said question particularly in view of the
fact that the pleadings of the parties are not before us.
E 22. We, therefore, are of the opinion that interest of justice shall be
subserved if the High Court is directed to consider the matter afresh. The
parties shall be entitled to file additional affidavits in the writ proceeding.
Respondent may in view of the subsequent events amend its writ petition.
In such an event, the High Court would not only consider the matter from
F the perspective of the original prayer made in the writ petition, but also the
reliefs which may be found to be available to the respondent in view of the
subsequent events including the Report of the Inspection Committee. Till an
appropriate order is passed by the High Court, status quo as obtaining today •
in regard to supply of coal shall continue. As the matters are being remitted
to the High Court, we do not intend to pass any separate order in the
G contempt petition. The appeals, are therefore, allowed and the matter is
remitted to the High Court upon setting aside the impugned judgment for
consideration of the matter afresh. However, in the facts and circumstances
of this case, there shall be no order as to costs.
KKT. Appeals allowed.