Supreme Court of India

CHANDA C. KADAM & ORS.versusADDITIONAL COLLECTOR & COMPETENT AUTHORITY

Citation
2013 INSC 742
Decided
1 November 2013
Disposal
Case Partly allowed

Holding

The No‑Objection and Occupancy Certificates are valid for the entire plot except for the 37,865 sq ft area reserved to the petitioners under the MOU, which remains unaffected until the MOU is set aside.

Summary

The petitioners, heirs of the deceased CG Kadam, entered into a 1992 Memorandum of Understanding (MOU) with developers, granting the developers rights to develop part of a 42,669.40 sq m plot while reserving a 37,865 sq ft floor‑space index (FSI) for the petitioners. The developers obtained a No‑Objection Certificate and an Occupancy Certificate for the entire plot, despite the petitioners’ claim that the MOU reserved the 37,865 sq ft for them. The petitioners challenged the certificates, arguing the authorities should have examined the MOU and that the certificates violated the MOU’s terms. The Supreme Court held that while the authorities are not required to adjudicate title, they must form a prima‑facie view of ownership and therefore should have considered the MOU; however, the certificates remain valid for the whole plot except for the 37,865 sq ft area expressly reserved to the petitioners. The Court upheld the High Court’s order but limited its effect, stating the certificates are inoperative for the reserved portion until the MOU is set aside. Consequently, the Special Leave Petition was partly allowed, preserving the developers’ certificates except for the petitioners’ retained area.

Issues considered

  • Whether the competent authority was duty bound to examine the terms of the MOU before granting the Occupancy Certificate.
  • Whether the grant of the No‑Objection Certificate and Occupancy Certificate to the developers is valid despite the MOU reserving 37,865 sq ft for the petitioners.
  • Whether the petitioners can challenge the certificates for the entire plot of land.
  • Whether the High Court’s judgment upholding the certificates should be set aside on the ground of procedural irregularity.
  • Effect of the repeal of the Urban Land Ceiling Act on the validity of the certificates.

Legislation cited

Subjects

Urban developmentPartnership agreementMemorandum of UnderstandingOccupancy CertificateNo Objection CertificateFloor Space IndexUrban Land Ceiling ActPerpetual leaseAdministrative lawProperty rights

Judgment

                  [2013] 14 S.C.R. 663


              CHANDA C. KADAM & ORS.                         A
                             v.
ADDITIONAL COLLECTOR & COMPETENT AUTHORITY
                   & ORS.
SPECIAL LEAVE PETITION (CIVIL) N0.16786 OF 2013

                  NOVEMBER 01, 2013
                                                              8

          [GYAN SUDHA MISRA AND PINAKI
               CHANDRA GHOSE, JJ.]

      Urban Development - Creation of partnership C
(Developers) Firm - As per the terms of Memorandum of
Understanding (MOU) one of the partners (predecessor of the
petitioners) was required to give 42,669.40 sq. mtrs. of land
to the firm, for development - Out of the total land, 20903 sq.
mfr. Of land given to him on perpetual lease with Floor Space D
Index (FSI) measuring 37865 sq. ft. which he was entitled to
retain - Competent authority granted 'No objection Certificate'
and 'Occupation Certificate' in respect of the entire land given
on perpetual lease - Objection of petitioners to the grant of
certificates - Held: Terms of the MOU entitled the petitioners E
to retain certain area out of the total land - Therefore neither
the developers nor the retainers were entitled to claim the
entire land - Hence 'No Objection Certificate' and 'Occupation
Certificate' granted in favour of the developers is held valid -
But the same shall not be valid or operative for the area of F
37865 sq. ft. retained by the petitioners - Urban Land Ceiling
and Regulation Act, 1976.

    Petitioners' predecessor entered into Memorandum
of Understanding (MOU) with respondent Nos.4, 5 and 6,
whereby a Partnership firm (respondent No.3) was G
constituted. As per the MOU the petitioners' predecessor
was to bring in the plot of land admeasuring 42,669.40
sq. mtrs. For a total consideration of Rs. 2.40 crores,

                            663                               H
    664     SUPREME COURT REPORTS               [2013] 14 S.C.R.


A   which he was to receive in instalments. Pursuant to the
    MOU, respondent Nos.3 to 6 were entitled to development
    and construction on a part of the plot of land measuring
    21766 sq. mtrs. Another part of the plot measuring 20903
    sq. mtrs. was to be leased for a period of 999 years
B   constituting lease in perpetuity by respondent No.3 -
    Firm in favour of the petitioners' predecessor with the
    Floor Space Index (FXI) measuring 37,865 sq. ft. The
    structures existing thereon continued to exist. As.per the
    MOU, in respect of the leased area, the petitioners'
c   predecessor would have exclusive and uninterrupted
    right. Respondent Nos.4 to 6 took power of Attorney from
    the petitioners' predecessor. By using Power of Attorney,
    respondent No.6 obtained Commencement Certificate u/
    s.8(4) of Urban Land Ceiling Act. The petitioners (the legal
    heirs), filed a suit challenging the MOU/Deed of
0
    Partnership alleging fraud at the instance of respondent
    Nos. 4 to 6.

         The respondent-developers, thereafter sought formal
    permission from respondent No.1 u/s.22 of Urban Land
E   Ceiling Act. Respondent No.2 granted 'Occupation
    Certificate'. The petitioner filed writ petitions, challenging
    the permission granted u/s. 22 and the grant of
    'Occupation Certificate'. The High Court directed the State
    to consider whether any action was required in respect
F   of the permission granted u/s.22. Further the matter was
    pursued by the petitioner to the Chief Minister, who
    directed cancellation of the 'Occupation Certificate'.

      The Land Ceiling Act was repealed and all the
G proceedings under the Act abated. Therefore, the
  respondent-developers pursued the matter again and
  respondent No. issued 'No Objection Certificate'.
  Respondent No.2 then restored the 'Occupation
  Certificate' earlier granted. The petitioner challenged the
  grant of 'No Objection Certificate' and restoration of
H
  CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 665
            COMPETENT AUTHORITY
 'Occupation Certificate' by filing writ petition, which was     A
 dismissed by the High Court. Hence, the present petition.
      Partly allowing the petition, the Court

        HELD: 1. Although an administrative authority
  including Municipal Corporation while granting                 B
  Occupancy Certificate after completion of the project
  discharges administrative function and may not be duty
  bound to examine the title of the contesting parties, it is
  certainly expected to examine the documents of title or
  MOU while granting such certificate specially when the         C
  matter is remitted to them for examining the correctness
  and validity of such occupancy certificate. In the process,
  it is surely not expected to adjudicate and determine the
  question of title of the contesting parties but is certainly
  obliged to form an opinion prima facie as to whether the       D
1
  Occupancy Certificate is being granted to the rightful
  owner. [Para 10) [675-F-H]

      2. In the present case, the respondent-developers 3
 to 6 had approached respondent No.2 - Municipal                 E
 Corporation of Greater Mumbai for issuance of
 occupation certificate which was issued by the
 respondent No. 2 vide its letter dated 30.3.2000 in spite
 of a protracted litigation and pursuance of endless
 remedies out of Court wherein the petitioner had even
 approached the Chief Minister of the State who had
                                                                 F
 intervened and directed the competent authorities to
 examine the grievance regarding grant of occupancy
 certificate and no objection from the Urban Land Ceiling
 Authority. Unfortunately, the C~mpetent Authority never
 cared to examine the MOU even prima facie while                 G
 granting Occupancy Certificate to the Respondent No.3
 which led to litigations doing several rounds. [Para 10]
 [676-C-F]

      3. The petitioners have challenged the grant of            H
    666     SUPREME COURT REPORTS            [2013) 14 S.C.R.

A occupation certificate for the entire plot of land which
  were duly granted to the respondent - developers for
  development of the plot of land in pursuance to the MOU
  entered into between the petitioners' deceased father
  and the respondent 3, 4, 5 and 6 comprising an area of
B 20903 sq. mtrs. by obtaining long lease of 999 years
  which they claim to be the 'retained portion' with
  exclusive right to use FSI of 37,865 sq. ft. on the said plot
  of land on which 18 structures are claimed to be existing
  which is used for the film shooting purposes. The
c petitioners alleged that those structures were falsely,
  illegally and fraudulently shown by the developers as
  demolished and thus succeeded in obtaining occupancy
  certificate for the entire plot contrary to the terms and
  conditions of the MOU. (Para 15] (678-F-H; 679-A]
D        4. The petitioners all through had been contesting
    the grant of occupancy certificate in regard to the entire
    plot of land which admittedly had been given on
    perpetual lease by the respondent - developers to the
    deceased petitioners' father who had already executed
E   a MOU and Power of Attorney. If the petitioners had taken
    this stand which they have taken before this Court and
    had urged that the reserved area as per the MOU bearing
    37865 sq, ft. was the only area which had been reserved
    in their favour along with the structures as FSI in terms
F   of the MOU, the petitioners· plea for rejection of
    occupancy certificate for the entire area perhaps could
    have been accepted and they would have been allowed
    to retain this portion by modifying the occupancy
    certificate partially but the petitioners themselves appear
G   to have created problems for themselves by litigating as
    they challenged the grant of occupancy certificate for the
    entire plot of land comprising an area of 20,903 sq. mtrs
    completely overlooking that this part of the land had also
    been given out to the respondent - developers in terms
H   of the MOU by their deceased father and exclusive right
./




     CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 667
               COMPETENT AUTHORITY
     to the owner was confined to the use of FSI 37865 sq. ft.        A
     only on the said plot of land which includes the existing
     18 structures used for shooting purposes. [Para 18] (680-
     D-H; 681-A]

          5. The stand of the petitioners in regard to the entire     8
     plot of land comprising an area of 20903 sq. mtrs could
     not have been assailed by them in view of the MOU and
     the Power of Attorney, unless they finally succeed by
     obtaining a decree in their favour in the civil suit by
     getting the MOU cancelled, which is still pending trial.         C
     [Para 18] (681-A-B]

          6. But under the garb of the 'retained portion' they
     raised the dispute in regard to the entire area of the plot
     which was given for development to the respondents on
     which they have already raised construction and is in            D
     occupation of the buyers which prima facie is in
     consonance with the MOU at least until the MOU is set
     aside by granting a decree in favour of the petitioners in
     the civil suit which is pending trial. [Para 18] [681~E-F]
                                                                      E
          7. The stand of the respondents is also far from
     reasonable or fair, at least in so far as their claim for this
     37865 sq. ft. is concerned, as they have shown the
     structures on this piece of land as demolished while
     claiming occupancy certificate from the respondent No.2
     Municipal Corporation for the plot for which MOU had
                                                                      F
     been arrived at. This they appear to have done
     completely overlooking the specific clause in the MOU
     itself which clearly lays down that the said portion
     covering FSI for 37865 sq. ft. on which structures
     comprising a stream and other installations stand and is         G
     being used as a film set, were to be retained by the owner
     of the property. [Para 19] (681-G-H; 682-A]

         8. However, when the respondent-developers filed
     an application for releasing the land from the coverage          H
    668     SUPREME COURT REPORTS            [2013) 14 S.C.R.


A of the Urban Land Ceiling Act there could have been no
  reason for the petitioners to object to the same as in any
  view, if this land had been seized as surplus land under
  the Urban Land Ceiling Act, neither the petitioners/owner
  nor the developers/respondents would have benefited as
B the land would have vested in the State. Fortunately, for
  the contesting parties, the Urban Land Ceiling Act was
  repealed and as the physical possession of the land had
  not been taken by the State, the land was rightly released
  from the ambit of the Urban Land Ceiling Act as the Act
C was repealed. [Para 19] [682-B-D]

       9. The petitioners are entitled to retain an area of
  37865 sq. ft. of land from the plot in question and the
  occupancy certificate which has been granted to the
  respondent - developers shall not affect the petitioners'
D right to retain this portion of the land. [Para 22] [683-E-F]

       10. If the respondent No.2 - Bombay Municipal
  Corporation may have any reason to claim land alleging
  extra consumption of the FSI on the plot in question
E comprising 20903 sq. mtrs, the same shall be claimed
  only from the balance area of the disputed plot and shall
  not be claimed from the FSI comprising an area of 37865
  sq. ft. reserved for the occupation of the petitioners under
  the MOU; The occupancy certificate and the no objection
F certificate which have been granted in favour of the
  respondent No.3 - developer therefore shall be valid for
  the plot in question except for an area of 37865 sq. ft. to
  which the petitioners are clearly entitled as per the
  unambiguous clause in the MOU until the petitioners
G succeed in getting the MOU set aside in the suit which is
  pending trial. [Para 22] [683-F-H; 684-A]

      11. Thus, although the judgment and order of the
  High Court is upheld and the occupancy certificate as
  also the 'no objection certificate' granted in favour of the
H respondent No.3 are approved, the same shall not be
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 669
          COMPETENT AUTHORITY
valid or operative for an area of 37865 sq. ft., the                                      A
description of which is given in the MOU and is in
occupation of the Petitioners. [Para 23] [684-B-C]

     CIVIL APPELLATE JURISDICTION : Special Leave
Petition No. 16786 of 2013.
                                                                                          B
0   •From the Judgment & Order dated 11.02.2013 of the
Division Bench of the High Court of Judicature at Bombay in
Writ Petition No. 1299 of 2012.

 r~ Dr. A.M. Singhvi, Fai"id F. Karachiwala, Bhavik Manik for                             C
ttiEfl=>etiti6ners'. ·" ·     ·                        u       •
                     ' ~-   ,. .               .
rn: :. ·                                - -~               ,




 .. • Rohintori Nariman, Shyam Divan, Kavin Gulati, Shekhar
Naphade; Hemant Shah, Neha S. Verma,· Rashmi Singh,
Deeptakirti Verma, Arun R. Pedneker, Sanjay V. Kharde, Asha
Gopalan Nair, Jayashree Wad, Ashish Wad, ·Tamali Wad,                                     D
Kanika Baweja Niharika Bapna, J.S. Wad & Co., for the
Respondents.                                            ' ··

        '
            The
             '
                .Judgment
                ' ..
                          of the Court
                          ..      .('
                                       was
                                       - .-·
                                             delivered by
                                                                                          '"




       GYAN SUDHA MISRA, J. 1: ·-The petitioners herein have                              E
chaHen~fed the judgment and order of the High Court of
Judicature at Bombay dated 11.2.2013 whereby the wrlt'petition
No. 1299/2012 filed.by the petitioners herein was dismissed
by the Division. Bench of the High Court since it refused Jo set
ciside -the 'No ObjeCtion
 U~CD                        - -
                                 Certificate' granted.in favou·r of:the.
                                                   i       -~      ·"'   ·   ·   ·· · ~
                                                                                          F
C/?i'~t g~ing respondents by the. Competent Authqrity under :the
       0
~f.~tfli~.~d Ceiling Act, Greater Mumbai and·further refused
tg,~e1~f.t~'~~l!~~t orders .dated 17,th Decembe,r, 2008 a_nd 2nd
~Krrq\R~fo6R~8 e~~§.~d by. the respondent No .. 2 - M.uni<;ipal                           G"



~
   f?fpo~ftMoR @f09.r~~0 ~umbai restoring the 'Occupation
     ffi:f~t~~9rcim~b~P~~~.b.. inJ~vg,~,r of responden. t~ No.3 Mis ..
   !~~~~H~~~M6lfls~r~nJihf6 ~Jan &<>i~r .''ide its i~pugned.
i~~9'Bl'mt,~n.'1iLP.r'8~f) ~~l>. ,RJ~a~~~ 1 tcp;!igld ga~H~tPEt petitioners
                iP
i'b9HJ~. 0 tJ11 ~t~~:i~~cj 6'{,e~~~l~Yft.l?f~~i~.~Jw1fJl~tl~!19ing                        ...
the order granting occupancy certificate to the respondent No.3                           H
    670        SUPREME COURT REPORTS                [2013] 14 S.C.R.


A   but the same did not deter them from filing a writ petition in the
    High Court which lacked merit and also suffered from delay and
    laches which led to the dismissal of the writ petition filed by the
    petitioners herein.
      2. The substantial question, therefore, which requires
B determination in this Special Leave petition in order to avoid
  gross miscarriage of justice affecting valuable rights of the
  contesting parties lies in a narrow compass which may be
  formulated as follows:-

c         "Whether approval of the High Court to the grant of
          Occupancy Certificate by the Competent Authority contrary
          to the express terms and conditions in the Memorandum
          of Understanding affecting the valuable rights of all the
          stakeholders in the disputed property should not be treated
          as a perversity so as to invoke the jurisdiction under Article
D
          136 of the Constitution?"

    As also:
          "Whether the competent authority was not duty bound to
          examine the terms and conditions of the Memorandum of
E
          Understanding before granting Occupancy Certificate to
          the claimant-respondent giving rise to a protracted
          litigation."
       3. The factual background of the matter in so far as it is
F relevant for appreciating the controversy involved herein
  discloses that the petitioner's predecessor i.e. the deceased
  (father of the petitioner) Chandrarao Ganpatrao Kadam
  (referred to as Mr. CG Kadam) entered into a Memorandum
  of Understanding (for short 'MOU') dated 7.10.1992 with the
G respondent Nos. 4, 5 and 6 who constituted partnership firm
  M/s Wellworth Developers being respondent No. 3 hereto. The
  deceased predecessor of the petitioner Late Mr. CG Kadam
  admittedly owned a large tract of land comprising an area
  admeasuring 42,669.40 sq. mtrs. bearing CTS No. 47 and 47/
H 1 to 47120 of village Chandivali, Mumbai and CTS Nos. 17 and
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 671
COMPETENT AUTHORITY [GYAN SUDHA MISRA, J.)
18 of village Saki, Mumbai. As per the terms of MOU, the A
deceased Mr. CG Kadam (predecessor of the petitioners
herein) and respondent Nos. 4, 5 and 6 as already stated
formed a partnership firm subject to certain terms and
conditions in view of which the deceased was to bring in the
said plot of land for a total consideration of Rs. 2.40 crores B
which the deceased Mr. CG Kadam was to receive in
installments. Pursuant of the MOU, the respondent No.3 to 6
were entitled to development and construction on a part of the
plot of land measuring 21766 sq. mtrs. described in the second
schedule to the MOU and another part of the said plot of land c
admeasuring 20903 sq. mtrs. which the petitioners referred as
their retained portion was to be leased for a period of 999
years constituting lease in perpetuity by respondent No. 3 in
favour of the deceased Mr. Kadam with the Floor Space Index
(FSI) measuring 37,865 sq. feet specified on the said portion D
for the use of the deceased Mr. Kadam. The structures existing
on the retained portion continued to exist even today as per the
petitioners' case who are the legal heirs of late CG Kadam and
are running a film studio for shooting purposes on the retained
portion but have wrongly and illegally been shown as E
demolished by the respondent No.3 - developer while obtaining
occupancy certificate for the plot.

      4. On 9.10.1992, the deceased, predecessor of the
petitioners Mr. Kadam and the contesting respondents 4, 5 and
6 signed the deed of partnership - M.O.U. and as per the MOU, F
the deceased Mr. CG Kadam decided to enter into an
arrangement in respect of the entire property in the manner
provided in the MOU which laid down that the party of the first
party i.e. deceased CG Kadam agreed to bring 'the entire
property' into partnership on terms and conditions incorporated G
in the MOU whereby the developers referred to as the second,
third and fourth parties in the MOU were entitled to use and
exploit the Floor Space Index (FSI) of the entire property subject
to the terms and conditions stated in the MOU which further laid
down that the development and construction will take place on H
        672       SUPREME COURT REPORTS                 [2013] 14 S.C.R.


    A   the portion which is specifically referred to in the second
        schedule to the MOU and the garden area/amenity, open
        spaces and compulsory open spaces in order to enable such
        development and construction on the portion described in the
        second schedule shall be made available out of the remaining
    B   area being retained by the party of the 1st part i.e. the
        petitioner's predecessor Mr. Kadam.

              5. The MOU further enumerated that the deceased Mr. CG
        Kadam referred to as "party of the 1st part" in the MOU will
    C   have exclusive and uninterrupted right to use/occupy and enjoy
        the balance area (approximately 25,000 sq. yards equivalent
        to 20903 sq. metres) which is marked by black colour boundary
        line and shaded in green colour wash on the plan annexed with
        the MOU. The rights reserved in favour of the respondent -
        developers to the land were thus subject to the right of use,
    0
        enjoyment and occupation of the 1st party i.e. deceased CG
        Kadam, which consists of structures comprising of a stream
        and other installations and is being used as a film set. The MOU
        still further lays down that the parties and their assigns/
        developers undertake not to disturb or otherwise do any act to
;   E   prevent the said use, enjoyment and occupation bf the party of
        the 1st part/deceased CG Kadam to the said structures on the
        marked property being used for film shooting. More specifically,
        the parties. Of the second, third and fourth parts/developers will
        not do any act to interfere with the totally reserved net Floor
    F   Space lnde:X to the extent of 37,865 sq. ft. inclusive of the Floor
        Spece ·Index consumed by the existing structures in the said
        marked property to be used by the party of the first part i.e. the
        predecessor of'the pet"itioners. In this regard, it may be
        important to highlight at this stage that one of the specific
    G   clauses' in the MOU clearly stipulates as follows:-

              "The parties of the second, third and fourth party will not
              do any act, to interfere with the totally reserve net Floor
              Space Index to the extent of 37,865 sq. feet·(inclusive of
              the Floor Space Index consumed by the existing structures
    H
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 673
COMPETENT AUTHORITY [GYAN SUDHA MISRA, J.]

    in the said marked property) to be used by the party of the         A
    first part."

The MOU further incorporates as under:

    "The party of the first part shall be at liberty (subject to what
    is stated hereinabove) to use and develop the said                  B
    marked property without any objection from the parties of
    the second, third and fourth parts and the party of the first
    part shall have a net Floor Space Index of 37,865 sq. ft.
    reserved for his exclusive use in future in the said marked
    property (which includes the Floor Space Index already              C
    consumed by the existing structures on the said marked
    property".

The MOU further adds a clause as follows:-
                                                                        D
    "The said Floor Space Index of 37,865 Sq. ft. shall not be
    used by the parties of the second, third and fourth parts
    for any purpose whatsoever and the party of the first part
    undertakes not to use any further FSI in excess of 37,865
    Sq. ft."
                                                                        E
      6. Based on the above clear stipulation in the MOU, the
deceased predecessor of the petitioners was to bring in a
partnership firm of the entire plot of land for development and
the partnership firm was held entitled to enjoy the Floor Space
Index of the entire property subject to the terms and conditions        F
in the MOU with a specific clause for reservation of 37,865 sq.
ft. of Floor Space Index for' the exclusive use of the party of the
first part i.e. deceased CG Kadam referred to in the MOU. In
accordance with the terms of the MOU, the deceased Mr.
Kadam and the respondent partners signed the deed of                    G
partnership. Respondent Nos. 4 to 6 thereafter on 14.10.1992
also took Pofier of Attorney from the deceased Mr. Kadam to
act in the name of the deceased in respect of the said plot of
land under the MOU and a supplementary deed of partnership
was also signed by the deceased Mr. Kadam. In the MOU,
                                                                        H
    674       SUPREME COURT REPORTS                [2013] 14 S.C.R.

A specific details for development of the property and its
  marketing were incorporated adding clause 21 to the effect
  "that the Party of the First Part (Mr. C.G. Kadam) shall give a
  Power of Attorney to the Parties of the Second, Third and
  Fourth Parts to do several acts relating to the development of
B the said property. It stated that "this power shall include
  authorities to get the plans sanctioned from the Bombay
  Municipal Corporation, construct buildings, sell flats, shops and·
  other premises and organise schemes under provisions of the
  Maharashtra Ownership Flats Act, Maharashtra Apartment
c Ownership Act and the Maharashtra Co-operative Societies
  Act, in respect of the said property." The MOU further
  incorporated clause 22 which laid down as follows:

                 "22. The Parties of the Second, Third and Fourth
          Parts shall incorporate the term in respect of the rights of
D         the Party of the First Part as stated in Clause 1 above in
          the individual agreements with the respective purchasers
          of the Flat/Premises and shall also obtain declaration in
          writing to that effect, a copy of which shall be delivered to
          the Party of the First Part."
E
       7. In pursuance to the MOU, the respondent No.6 using the
  Power of Attorney obtained Commencement Certificate on
  28.9.1993 and 12.11.1993 and he also secured an order under
  Section 8(4) of the Urban Land Ceiling Act for giving effect to
F the MOU. The predecessor of the petitioners CG Kadam
  thereafter died on or about 23.8.1995 and was survived by late
  Smt. Krishnabai Kadam who executed her last will and
  testament in favour of the petitioners/legal representatives.

       8. It appears that after expiry of almost 8 years from the
G date of MOU, the petitioners who are legal representatives of
  the deceased CG Kadam filed a suit on 27.1.20<\0 bearing suit
  No. 441/2000 in the High Court of Judicature at Bombay and
  challenged the MOU/Deed of Partnership dated 9.10.1992
  alleging fraud at the instance of respondent Nos. 4, 5 and 6 and
H the said suit is still pending trial before the High Court of
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 675
COMPETENT AUTHORITY [GYAN SUDHA MISRA, J.]
Judicature at Bombay. It is also borne out from the record that A
an interim order was also passed in this suit on 7.2.2000 by
which respondent Nos. 3 to 6 were prevented from disturbing
the petitioners' possession in respect of the retained portion
on the said plot of land which the deceased CG Kadam as per
the MOU was entitled to hold.                                   B

     9. The respondent - developers thereafter through
respondent No.3 in view of the MOU and the Power of Attorney
proceeded in the matter and sought formal permission from the
respondent No.1 - Additional Collector vide letter dated C
21.3.2000 under Section 22 of the Urban Land Ceiling Act in
order to enable them to approach respondent No. 2 Municipal
Corporation of Greater of Mumbai for getting the occupation
certificate in respect of the building which the respondent -
developers had constructed in pursuance to the MOU in
between 1992 and the year 2000. As per the case of the D
petitioners a false statement is alleged to have been made
therein by the respondent-Developer that the old structures on
the land which was given out to them by way of perpetual lease
for a period of 999 years had been demolished and that the
building was ready for occupation.                             E

     10. At this juncture, we deem it appropriate to observe and
highlight that although an administrative authority including
Municipal Corporation while granting Occupancy Certificate
after completion of the project discharges administrative F
function and may not be duty bound to examine the title of the
contesting parties, it is certainly expected to examine the
documents of title or MOU while granting such certificate
specially when the matter is remitted to them for examining the
correctness and validity of such occupancy certificate. In the G
process, it is surely not expected to adjudicate and determine
the question of title of the contesting parties but is certainly
obliged to form an opinion prima facie as to whether the
Occupancy Certificate is being granted to the rightful owner.
This, in our view, is essential which can cut short and minimize
                                                                 H
    676      SUPREME COURT REPORTS                 [2013] 14 S.C.R.


A   the litigation in regard to the grant of Occupancy Certificate
    which on several occasions gives rise to a cesspool and
    labyrinth of litigation as it has happened in the instant matter
    where the respondent No.3 succeeded in getting the
    Occupancy Certificate from the Municipal Corporation and the
B   grant of Occupation Certificate to the respondents triggered a
    long drawn litigation reaching to this Court. The petitioners
    cause of action initially was to challenge the 'no objection
    certificate' granted by the respondent No.1 under Section 22
    of the Urban Land Ceiling Act stating therein that the entire plot
C   of land is disputed wherein in some portion a film studio was
    set up for shooting purposes by Chandivali firm which is
    managed by the petitioners herein. However, on 30.3.2000, the
    respondent - developers 3 to 6 had approached respondent
    No.2 - Municipal Corporation of Greater Mumbai for issuance
    of occupation certificate which was issued by the respondent
0
    No. 2 vide its letter dated 30.3.2000 in spite of a protracted
    litigation and pursuance of endless remedies out of Court
    wherein the petitioner had even approached the Chief Minister
    of the State who had intervened and directed the competent
    authorities to examine the grievance regarding grant of
E   occupancy certificate and no objection from the Urban Land
    Ceiling Authority. Unfortunately, the Competent Authority never
    cared to examine the MOU even prima facie while granting
    Occupancy Certificate to the Respondent No.3 which led to
    litigations doing several rounds.
F
        11. Having failed to seek redressal of their grievance and
  the petitioners feeling seriously aggrieved of the grant of
  occupation certificate, filed a writ petition No.2832/2001 and
  assailed the grant of occupation certificate alleging that the
G respondent - developers had exercised the power of attorney
  after the death of their father-deceased Mr. CG Kadam and the
  development of the said plot of land was bad without any
  authority, jurisdiction and contrary to law. Subsequently, they
  also had filed another writ petition bearing No. 34/2002
H challenging the permission granted by the respondent No.1
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 677
COMPETENT AUTHORITY [GYAN SUDHA MISRA, J.]
under the Urban Land Ceiling Act on the ground that the same          A
was vitiated by fraud. The Division Bench of the High Court of
Bombay vide its order dated 26.2.2002 directed the State
Government to treat writ petition No.34/2002 as a complaint and
to consider whether any action or revision is required in respect
of the permission granted under Section 22 of the Urban Land          B
Ceiling Act. In pursuance to this direction, a meeting was
convened by respondent No.7 - State of Maharashtra through
its Chief Secretary wherein the parties informed the State
Government that the matter was likely to be settled which did
not come through and the petitioners therefore pursued the            c
matter further before the Chief Minister who directed the
respondent No. 2 - Municipal Corporation for cancellation of the
occupation certificate granted to the construction of the said
plot of land. It appears that in view of all these developments,
the occupation certificate granted in favour of the respondent -      D
developers was also initially cancelled. Further development
however took place in the matter when on 29.11.2007 the
Urban Land Ceiling Act was repealed by the Maharashtra
Government due to which the no objection certificate which was
granted under the Urban Land Ceiling Act was inessential since        E
all proceedings pending under the Urban Land Ceiling Act
stood abated in view of its repeal.

      12. The respondent- developer.s, therefore, pursued the
matter for restoration of the occupation certificate which had
been earlier granted to them. In response to the same, the            F
Additional Collector - respondent No.1 vide its letter dated
16.6.2008 addressed to the respondent No. 3 - developer
issued no objection certificate to the grant of occupation
certificate for the building constructed on the vacant plot of land
for which MOU had been entered.                                       G
     13. The petitioners felt aggrieved with the restoration of the
occupation certificate in favour of the developers and
challenged the same before the Government as also by filing
a writ petition bearing No. 1299/2012 in which the impugned
                                                                      H
    678     SUPREME COURT REPORTS                [2013) 14 S.C.R.


A judgment and order was passed by the High Court on 11th
  February, 2013 which is under challenge in this special leave
  petition and as already stated, the writ petition filed by the
  petitioners was dismissed as the petitioners were held to have
  indulged in vexatious and the multiple proceedings challenging
B the restoration of Occupation Certificate and the No Objection
  Certificate granted to the respondent - developer under the
  Urban Land Ceiling Act.

        14. Learned senior counsel Dr. A.M. Singhvi representing
C the petitioners, while assailing the judgment and order passed
  by the High Court inter alia submitted that the unilateral
  restoration of the occupation certificate by the Municipal
  Corporation of Greater Mumbai vide its impugned orders dated
  17.12.2008 and 2.11.2010 is illegal, arbitrary and
  unsustainable as the respondent - developer indulged in serious
0
  illegalities and fraud while constructing the building in question
  on the said plot of land as the petitioners' 18 legal and valid
  structures which are in existence for over 60 years and used
  for outdoor shooting purposes are shown as demolished though
  the petitioners continued to pay property tax which calls for
E interference by this Hon'ble Court for quashing and setting
  aside the occupancy certificate granted in favour of the
  respondent No.3-Developer.

        15. It may be relevant at this stage to note that the
F petitioners have challenged the grant of occupation certificate
  for the entire plot of land which were duly granted to the
  respondent - developers for development of the plot of land in
  pursuance to the MOU entered into between the petitioner's
  deceased father CG Kadam and the respondent 3, 4, 5 and 6
G comprising an area of 20903 sq. mtrs. by obtaining long lease
  of 999 years which they claim to be the 'retained-portion' with
  exclusive right to use FSI of 37,865 sq. ft. on the said plot of
  land on which 18 structures are claimed to be existing which
  is used for the film shooting purposes. The petitioners alleged
H that those structures were falsely, illegally and fraudulently
   CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 679
   COMPETENT AUTHORITY [GYAN SlJDHA MISRA, J.]
  shown by the developers as demolished and thus succeeded              A
  in obtaining occupancy certificate for the entire plot contrary to
  the terms and conditions of the MOU.

          16. However, the counsel for the petitioners having been
   confronted with the fact as to how the petitioners could             B
   challenge the grant of occupation certificate in regard to the
   entire plot of land which was given to the developers for
   developing and raising construction by their deceased father
   by a written instrument in the form of MOU and also executing
    Power of Attorney permitting the respondents to develop the
_ land for which occupancy certificate was granted, the counsel         C
   for the petitioners had to resort to an alternative argument by
   submitting that even under the alleged MOU dated 7 .10.1992
    between the owner CG Kadam and the developers it was
  . agreed that out of an area of 20903 sq. mtrs. for which a long
    lease of 999 years was granted to the respondent-developers,        D
   they had an exclusive right to own and use FSI of 37865 sq. ft.
   on the said plot of land wherein the existing 18 structures used
   for shooting purposes were existing. It was, therefore, submitted
   that even as per the MOU it was agreed that out of total area
    of the entire plot admeasuring 42,669.40 sq. mtrs, an area of       E
    21,766 sq. mtrs. was to be developed by the respondent -
    developer and an area of 20903 sq. mtrs. was to be retained
    by the owner by obtaining long lease of 999 years including the
    retained portion with exclusive right to the owner to use FSI of
    37865 sq. ft. on the said plot of land and even if it were to be    F
    held that the MOU is valid and binding on the petitioners, the
    petitioners entitlement at least to FSI of 37865 sq. ft. remains
    undisputed and the developers cannot interfere with the
    petitioners structures nor use its FSI for any reason whatsoever.
    For this purpose, the relevant portion of the MOU which is          G
    already quoted earlier in the foregoing paragraphs have been
    relied upon.

        17. Placing reliance on the aforesaid clauses in the MOU,
   it was submitted that the MOU expressly reserves the rights of       H
    680      SUPREME COURT REPORTS                   [2013] 14 S.C.R.


A the petitioners to at least an FSI of 37,865 sq. ft. if not the entire
  plot of land and the same could not be demolished or shown
  as demolished by the developers. It was further submitted that
  as per the Bombay Municipal Corporation admittedly the
  respondent Nos. 3 to 6 have consumed higher FSI than what
B they are entitled and in view of the same any recourse that the
  Municipal Corporation of Greater Mumbai may have for the
  extra consumption of the FSI can only be from the developer's
  portion and not from the FSI reserved for the benefit of the
  petitioners in the MOU.
c         18. While considering this aspect of the matter in the light
    of the arguments advanced relating thereto, it clearly emerges
    that if the petitioners had taken this stand right from the
    beginning, perhaps they might have been spared of this
    protracted litigation doing several rounds and finally reaching
D   to this Court. But it appears that the petitioners all through had
    been contesting the grant of occupancy certificate in regard to
    the entire plot of land which admittedly had been given on
    perpetual lease by the respondent - developers to the deceased
    Mr. CG Kadam/petitioner's father who had already executed a
E   MOU and Power of Attorney. If the petitioners had taken this
    stand whicli they have now taken and had urged that the
    reserved area as per the MOU bearing 37865 sq, ft. was the
    only area which had been reserved in their favour along with
    the structures as FSI in terms of the MOU, the petitioners plea
F   for rejection of occupancy certificate for the entire area perhaps
    could have been accepted and they would have been allowed
    to netain this portion by modifying the occupancy certificate
    partially but the petitioners themselves appear to have created
    problems for themselves by litigating as they challenged the
G   grant of occupancy certificate for the entire plot of land
    comprising an area of 20,903 sq. mtrs completely overlooking
    that this part of the land had also been given out to the
    respondent - developers in terms of the MOU by their deceased
    father and exclusive right to the owner was confined to the use
H   of FSI 37865 sq. ft. only on the said plot of land which includes
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 681
COMPETENT AUTHORITY [GYAN SUDHA MISRA, J.]
the existing 18 structures used for shooting purposes. Even at         A
the risk of repetition, it will have to be stated that the stand of
the petitioners in regard to the entire plot of land comprising
an area of 20903 sq. mtrs could not have been assailed by
them in view of the MOU and the Power of Attorney unless they
finally succeed by obtaining a decree in their favour in the civil     B
suit by getting the MOU cancelled, which is still pending trial.
As long as the validity of the MOU is not set aside by the decree
of a Court of competent jurisdiction, the petitioners contention
that the entire plot of land bearing 20903 sq. mtrs. which was
given for development on which constructions were raised, the          c
petitioners could not have been permitted to challenge the grant
of occupancy certificate for the entire plot of land. It is only at
the fag end of the litigation in the highest court before us that
the wisdom seems to have prevailed upon the petitioners to
submit that in any view they are entitled to 37865 sq. ft. out of      0   -,
the plot in question as there is a specific clause in regard to
this area in the MOU and this portion alone could be treated
 by the petitioners as the 'retained portion' for themselves
through their deceased father. But under the garb of this
'retained portion' they raised the dispute in regard to the entire     E
 area of the plot which was given for development to the
 respondents on which they have already raised construction and
 is in occupation of the buyers which prima facie is in
 consonance with the MOU at least until the MOU is set aside
 by granting a decree in favour of the petitioners in the civil suit
 which is pending trial.                                               F

     19. However, the stand of the respondents on the other
hand is also far from reasonable or fair at least in so far as their
claim for this 37865 sq. ft. is concerned, as they have shown
the structures on this piece of land as demolished while               G
claiming occupancy certificate from the respondent No.2
Municipal Corporation for the plot for which MOU had been
arrived at. This they appear to have done completely
overlooking the specific clause in the MOU itself which clearly
lays down that the said portion covering FSI for 37865 sq. ft.         H
    682     SUPREME COURT REPORTS                [2013] 14 S.C.R.

A on which structures comprising a stream and other installations
  stand and is being used as a film set, were to be retained by
  the owner of the property. However, when the respondent -
  developers filed an application for releasing the land from the
  coverage of the Urban Land Ceiling Act there could have been
B no reason for the petitioners to object to the same as in any
  view if this land had been seized as surplus land under the
  Urban Land Ceiling Act, neither the petitioners/owner nor the
  developers/respondents would have benefited as the land would
  have vested in the State. Fortunately, for the contesting parties,
c the Urban Land Ceiling Act was repealed and as the physical
  possession of the land had not been taken by the State, the
  land was rightly released from the ambit of the Urban Land
  Ceiling Act as the Act was repealed. But, when the respondents
  applied for occupancy certificate of the building on the plot in
  question, had the petitioners taken a reasonable stand by
0
  submitting that the occupancy certificate could be granted
  subject to retention of the portion comprising 37865 sq. ft.
  which as per the MOU, the owner was entitled to retain,
  perhaps the dispute between the parties could have been
E resolved but the petitioners had all through contested that the
  occupancy certificate for the entire plot of land was fit to be
  quashed and set aside overlooking that as per the MOU it was
  not open for the petitioners to assail the occupancy certificate
  in regard to the entire plot of land by using the expression
  'retained land' for the entire plot comprising 20903 sq. mtrs.
F since the entire plot could not have been treated as 'retained
  portion' by the petitioners as out of this plot of land only 37865
  sq. ft. alone could be treated as the retained portion in view of
  the specific clause under the MOU.

G       20. Ultimately, in course of the argument, the petitioners
  could be pinned down that they cannot claim the entire plot of
  20903 sq. mtrs. as their retained land since the retained portion
  out of this plot could be only an area of 37865 sq. ft .. But the
  petitioners all through had been contesting that the entire plot
H of land is their retained land overlooking that the entire plot
CHANDA C. KADAM v. ADDITIONAL COLLECTOR & 683
COMPETENT AUTHORITY [GYAN SUDHA MISRA, J.]
could not be treated as their retained land in the wake of the         A
MOU executed by their deceased father CG Kadam.

     21. When the matter reached at this juncture, learned
senior counsel, Mr. R. F. Nariman, appearing for the
respondents - developers, fairly made a statement before the           B
Court that if the dispute is confined to this portion of the land,
the respondents would agree to file an affidavit that they would
not claim this portion of the land, on which the respondents -
developer were directed to file an affidavit to that effect. But to
our amazement and to the surprise of the petitioners also, the         C
respondents appear to have resiled from their statement made
on their behalf as it has been stated in their affidavit that the
petitioners will be entitled to this area covering FSI of 37,865
sq. ft. only if they are able to establish their right on the basis
of the MOU in the suit which is pending trial. But even if the
respondents have failed to do so, we are not prepared to accept        D
their plea in view of the analysis made hereinabove at least in
so far as 37865 sq. ft. is concerned as that would be clearly
contrary to the express and specific clause in the MOU which
had been executed by both the parties.
                                                                       E
      22. We are therefore pleased to hold that the petitioners
are clearly entitled to retain an area of 37865 sq. ft. of land from
the plot in question and the occupancy certificate which has
been granted to the respondents - developers shall not affect
the petitioner's right to retain this portion of the land. We also     F
find substance in the plea of the petitioners to the extent that if
the respondent No.2 - Bombay Municipal Corporation may have
any reason to claim land alleging extra consumption of the FSI
on the plot in question comprising 20903 sq. mtrs, the same
shall be claimed only from the balance area of the disputed plot       G
and shall not be claimed from the FSI comprising an area of
37865 sq. ft. reserved for the occupation of the petitioners under
the MOU. The occupancy certificate and the no objection
certificate which have been granted in favour of the respondent
No.3 - developer therefore shall be valid for the plot in question
                                                                       H
    684       SUPREME COURT REPORTS                (2013] 14 S.C.R.


A   except for an area of 37865 sq. ft. to which the petitioners are
    clearly entitled as per the unambiguous clause in the MOU until
    the petitioners succeed in getting the MOU set aside in the suit
    which is pending trial.

        23. Thus, we although uphold the judgment and order of
8
  the High Court and approve of the occupancy certificate as also
  the 'no objection certificate' granted in favour of the respondent
  No.3 M/s Wellworth Developers, we are further pleased to hold
  that the same shall not be valid or operative for an area of
C 37865 sq. ft., the description of which is given in the MOU and
  is in occupation of the Petitioners.

         24. The special leave petition thus is partly allowed limited
    to the extent indicated hereinbefore.

    Kalpana K. Tripathy                              SLP partly allowed.


Search Indian case law

Ask in plain English, not just keywords. 25,000 AI words free, no card.

Try "Urban development"Sign in to search

For a digitally signed copy suitable for filing, refer to the court's own website. Only the court can issue one.